Click here to make tpub.com your Home Page

Page Title: Preparation of Equipment/Materials
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1106-97
Lesson Plan
Instructor's Notes
5. Waste
Receptacles for radioactive waste should be located by
the work station so that you may conveniently dispose of
waste without further contamination of the work area.
State that later in the course
C. Preparation of Equipment/Materials
the selection and use of the
1. Assemble survey meters
proper instruments will be
covered (Section VI).
The survey meter should be turned on and located in
close proximity to the work station. A preoperational
check is necessary before use to ensure the meter is
working properly. Position the detector so it is directed
toward your work area. This will enable you to
conveniently monitor your hands as you work and also
can indicate when materials are removed from shielded
containers. Always work with the audio turned on. Your
safety and the safety of others must take priority over the
concept that the sound may be disturbing to others.
Know the location of the nearest phones. Post the
Radiological Control Organization phone number
nearby.
2. Equipment preparation
Use dedicated equipment/tools when appropriate.
Cover/tape tools or equipment used during the job to
minimize radioactive contamination.
19


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business