Click here to make tpub.com your Home Page

Page Title: Containment Argon Leak From R-36
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1099-96
APPENDIX B - EXAMPLE DRILL SCENARIOS
Title:
Containment Argon Leak From R-36
Drill Number: 007-02
Revision Number: 0
SECTION I.
INITIAL CONDITIONS
PLANT MODE/DECAY HEAT:
Any
SYSTEM/EQUIPMENT:
82, 25\CTMT H&V E68/69, R3/4
WATCHSTATIONS:
ERT, RPT, CT, Control Room, SS
SPECIAL EQUIPMENT:
R-36 on line
PRE-DRILL NOTIFICATIONS:
IEM Cell Shift Supervisor
IEM CELL IMPACT:
Inerted with R-36 on line.
SPECIAL CONDITIONS AND
INSTRUCTIONS:
None
SECTION II.
PRECAUTIONS and LIMITATIONS
ABORT LIMITS:
If containment pressure approaches + 1 psig.
OPERATIONAL LIMITS:
None
TECH SPEC LIMITS
OR PRECAUTIONS:
IEM Cell 17.3.7.2.3
DRILL TEAM DUTIES:
Monitor RPT, ERT and Control Room responses.
REFERENCES:
Operation of IEM Cell Purification Unit, R-36, SN-82.1-11,
H-4-11125, IEM Cell Argon Purification System. CTMT
H&V, H-4-11502, 11547
SECTION III.
DRILL INITIATION
The drill is initiated by a drill team member reporting as an RPT to the Control Room that a
smear of 20,000 CPM (Beta, Gamma) was found in Cell 572 near R-36.
B 1-2


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business