Page Title: Evaporator Feed Tank Header Line Leak
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Evaporator Feed Tank Header Line Leak - hdbk10990064
Up
Establishing Nuclear Facility Drill Programs - index
Next
Evaporator Feed Tank Header Line Leak - hdbk10990066


DOE-HDBK-1099-96
APPENDIX B - EXAMPLE DRILL SCENARIOS
Title:
Evaporator Feed Tank Header Line Leak
Drill Number:
WEACDC04
Revision Number: 0
2. Use required drill communications, that is, "THIS IS A DRILL," before and after each drill-
related communication over radios or public address systems.
3. Assume the following initial facility conditions: (" " indicates a required initial condition for this
scenario, "*" indicates a distraction to be used at the discretion of the drill coordinator). Note:
For distractor selected, provide crew with appropriate procedure,
*
Rainfall has been very heavy for the past 24 hours
*
Truck filling Caustic Storage Tank.
*
GA-6 monitor testing in progress.
*
Truck filling Acid Storage Tank.
*
Chemical cleaning of filters in progress.
*
Unloading DWPF Tanker.
All other conditions are "as is."
4. Respond to drill conditions AS IF THEY ARE REAL.
DRILL EVENT GUIDE
RESPONSE/EVALUATION CRITERIA
CONDITION
* Denotes critical action step
Initiating CUE:
Drill Controller calls
Operator(s) at the scene:
Control Room to report water leaking from
piping between Feed Tank and Treatment
Building.
Reported spill to control room, including the
following:
Between Feed Tank and building
*
Location of leak/spill.
Contaminated Sump discharge
*
Type of spill.
Source/cause of leak/spill.
CUE: Failed weld at elbow
Wind speed and direction.
CUE: As is
Contaminated personnel.
CUE: Only if self-contaminated