Click here to make tpub.com your Home Page

Page Title: Multiple-Choice Test Item Writing Procedure cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1204-97
To prevent giving the correct answer, ensure that the distractors do follow grammatically
from the stem -- for example:
Test item:
During 100% normal power operation a single steam flow element to the steam
generator feedwater fails high. The steam generator feedwater control system
will cause:
(a)
The feedwater valves to increase steam generation level slightly before
returning the level to normal.
(b)
Before returning the level to slightly above normal, the feedwater valves
to increase the steam generator significantly.
(c)
The feedwater valves to increase the steam generator level to the level of
a reactor trip.
(d)
The feedwater valves to increase the steam generator level slightly and
maintain the increased level.
Test item with Improved Distractors:
During 100% normal power operation a single steam flow element to the steam
generator feedwater fails high. The steam generator feedwater control system
will cause:
(a)
The feedwater valves to increase steam generator level slightly before
returning the level to normal.
(b)
The feedwater valves to increase the steam generator level significantly
before returning the level to slightly above normal.
32


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business