Click here to make tpub.com your Home Page

Page Title: Appendix E Sample Performance Test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1205-97
APPENDIX E
SAMPLE PERFORMANCE TEST
TEST ID#
REV.#
PAGE
1
OF
5
TASK #:
TASK TITLE:
AVG. TIME TO PERFORM:
8123506447-3
Inspect Lube Oil Cooler
3 Hours
(water side)
Emergency Diesel Engine
PREREQUISITES:
1. PMT General Course
2. Facility General Course
3. Facility Specific SE-204 Diesel Generator Course
REFERENCES:
1. NMPT 801.A1 - Emergency Diesel Engine Technical Specification
2. NMPT 801.B - Emergency Diesel Preventive Maintenance Procedure
3. NMPT Form 801 - Preventive Maintenance Report
4. NMPT Facility Plan A-804.402
5. NMPT 101.90 - System Depressurization
APPROVAL:
Title
Date
Title
Date
INSTRUCTIONS TO EVALUATOR:
1.
This evaluation standard contains the details for the evaluation of knowledge and practical requirements.
2.
Prior to administering the performance test, ensure that the trainee has completed all related training.
3.
Prior to administering the performance test, read the "Instructions to the Examinee" to the trainee and review
the conditions with him/her. Also, ensure the materials listed are on hand and available for use.
4.
When evaluating knowledge requirements, only ask those questions listed in the Knowledge Requirements
section. Compare the trainee's response with the answer provided to determine if the question is answered
correctly. Failure of any two questions constitutes failure of the performance test.
5.
When evaluating task performance, the trainee is expected to perform the steps in sequence. A "Sat" can
only be awarded after the trainee achieves the listed standard. If a question is included with a step, it must be
asked and answered before proceeding with the evaluation. Mark each step as "Sat" or "Unsat." Performing
any step out of sequence, failing two or more non-critical steps, or any single critical step constitutes a failure
of the performance test.
6.
Coaching is not permitted during an evaluation. Stop the evaluation when actions may result in damage to
personnel or equipment.
7.
Ensure all the information in the Scoring/Remarks section is correct and complete and that you and the
trainee have signed the performance test.
8.
Notify trainee of his/her score immediately upon completion of the performance test.
E-3


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business