Click here to make tpub.com your Home Page

Page Title: ISMS Phase II Verification Specifics cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-3027-99
The focus of Phase II verification is the implementation of integrated processes for accomplishing
work safely. The documentation of other reviews can be enlightening and reduce the verification
effort. It is an evaluation based on performance of the adequacy of the implementation of the
ISMS. All available information such as previous ORRs, ISMS verifications, EH site
assessments, etc. should be used. It should also include an assessment of facility level
performance.
The Phase II verification is more focused on the planning and control of work including feedback
and improvement. Through the evaluation of work planning, control, and feedback and
improvement, it is possible to evaluate the effectiveness of the implementation of the ISMS
Description. Two different aspects are addressed and evaluated.
(1) Are the practices and mechanisms that are observed relevant to accomplishment of work,
and do they follow and comply with the mechanisms that are discussed in the ISMS
Description?
(2) Do the practices and mechanisms observed during the conduct of actual work meet the
functions and principles of Integrated Safety Management?
The Phase II evaluation is conducted by focusing on the management, operations, and Subject
Matter Expert (SME) areas. Implementation of the Authorization Basis or Authorization
Agreement is evaluated. Practices for definition of individual work (maintenance, processes,
experiments, or construction projects), identification of the hazards associated with the work,
development and implementation of the controls, authorization and control of the actual work,
and feedback and improvement processes are evaluated. The Phase II verification also includes
an evaluation of the status of implementation of the DOE commitments to Integrated Safety
Management. Through this evaluation from the perspective of line management, SMEs, and
DOE, the status of implementation of ISM can be determined.
It is important to recognize that the ISMS Phase II verification is not an ORR that determines the
readiness to conduct work safely. The Phase II verification focus is on the implementation of the
processes through which work is planned and managed to ensure that it is conducted safely. The
Phase II verification is an evaluation as to whether the functions and principles described in the
DOE Policy 450.4 have been effectively translated into policies and procedures and whether
those policies and procedures have been effectively implemented within the workplace.
While the Phase I verification consists primarily of documentation reviews and management
interviews, the Phase II verification is primarily a performance-based review of the functioning
ISMS. This should be clearly reflected in the RP used to guide the Team. The site, facility, or
activity procedures and policies that implement the Phase I requirements should be reviewed to
validate the flowdown of requirements. Personnel in the operations and support organizations
should be evaluated to determine their understanding of these requirements in all appropriate
aspects of operations. Most importantly, the review should include the observation of program
mission operations as a demonstration of the integration of all aspects of the ISMS.
22


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business