Click here to make tpub.com your Home Page

Page Title: Uninterruptible Power Supply (UPS)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-XXXX-2005
06/30/2005
640.
UNINTERRUPTIBLE POWER SUPPLY (UPS). A power supply that provides
automatic, instantaneous power, without delay or-transients, on failure of normal power.
It can consist of batteries or full-time operating generators. It can be designated as
standby or emergency power depending on the application. Emergency installations
must meet the requirements specified for emergency power. [DOE O 5480.30]
[EH62dd1]
641.
UNINTERRUPTIBLE POWER SUPPLY. A system intended to provide a continuous
source of power, without delay or transients, upon degradation of failure of the normal
source of power. [DOE-STD-3003-2000]
UNIQUE IDENTIFIERS. The part of a paired set of labels, used in records that contain
642.
confidential information, that does not identify individuals except by using the matching
label. [10 CFR 850.3]
643.
UNIRRADIATED ENRICHED URANIUM (UEU). Naturally occurring uranium
enriched with U-235 above its natural abundance of approximately 0.72 percent (weight
percent) that has not been exposed to a neutron flux. [DOE O 6430.1A]
644.
UNPLANNED SHUTDOWN. An unplanned facility shutdown for any cause, such as
equipment malfunction, personal error, or onshift operator response to indications of an
unsatisfactory situation, or a situation that would have had unsafe consequences without
shutdown. Also, an unplanned shutdown directed by contractor management, local DOE
officials, or by Headquarters. [DOE O 5480.31] [EH62dd1]
645.
UNQUALIFIED PERSON. A person who is not a qualified person. [NFPA 70E]
UNREVIEWED SAFETY ISSUE (USI). A USI [for an Accelerator Facility] exists if a
646.
proposed change, modification, or experiment will either: (1) significantly increase the
probability of occurrence (through reduction in the margin of safety or otherwise) or the
consequences of an accident or malfunction of equipment important to safety from that
evaluated previously by safety analysis; or (2) introduce an accident or malfunction of a
different type than any evaluated previously by safety analysis which could result in
significant consequences. [DOE 0 5480.25 cancelled, DRAFT DOE G 420.2-X]
647.
UNREVIEWED SAFETY QUESTION (USQ). A situation where
A. The probability of the occurrence or the consequences of an accident or the
malfunction of equipment important to safety previously evaluated in the
documented safety analysis could be increased;
104
DRAFT


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business