Click here to make tpub.com your Home Page

Page Title: Department of Energy (DOE) Order 414.A, Quality Assurance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1162-2003
Supporting Knowledge and/or Skills
a.
Discuss the purpose, scope, general content, and application of the ISA Standards.
b.
Given a project involving process control instrumentation, identify the proper ISA
Standards necessary to effectively evaluate that element of the project.
c.
Discuss what constitutes acceptable contractor performance consistent with the
requirements of the above standards.
d.
Given the design drawings and specifications for a process control system, verify
compliance with the appropriate ISA Standards.
31.
Instrumentation and control personnel shall demonstrate a familiarity level knowledge of
Department of Energy (DOE) Order 414.A, Quality Assurance, as it applies to instrument
and control systems.
Supporting Knowledge and/or Skills
a.
Describe the types of documents related to instrumentation and control that should be
controlled by a document control system.
b.
Discuss the requirements for revision and distribution of controlled documents.
c.
Discuss the determination of calibration frequency for measuring and test equipment.
d.
Describe the effect of using inappropriate calibration standards on test equipment.
e.
Discuss the key elements of the procurement process for instrument and control systems
as described in the DOE Quality Assurance order.
f.
Discuss calibration techniques for various instrument types.
g.
Discuss correct actions to be taken for an instrument found out of calibration.
h.
Discuss instrument calibration data trending.
i.
Discuss the quality assurance measures required for each of the following elements of a
project:
Design control
Procurement control
Instructions, procedures, and drawings
Document control
Control of purchased material, equipment, and services
Identification, control, and traceability of materials, parts, and components
Control of special processes
Inspection
Test control
Calibration and control of test and measurement equipment
Handling, storage, shipping, and preservation
Inspection, test, and operating status
Nonconformity of material, parts, or components
Corrective action
26


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business