Click here to make tpub.com your Home Page

Page Title: Supplemental Information
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



ANSI/IEEE 336-1985,  "IEEE Standard for Installa-
S.
tion,  Inspection,  and  Testing  Requirements  for  Power,
Instrumentation, and Control Equipment at Nuclear Facilities."
498-1980,  "IEEE Standard Requirements
ANSI/IEEE
T.
for the Calibration and Control of Measuring and Test Equipment
Used in Nuclear Facilities."  (This standard was revised and
issued as ANSI/IEEE 498-1985, "IEEE Standard Requirements for the
Calibration and Control of Measuring and Test Equipment Used in
Nuclear Facilities.")
ANS 3.2-1976, "Administrative Controls and Quality
U.
Assurance for the Operational Phase of Nuclear Power Plants."
(This standard was revised and issued as ANSI/ANS 3.2-1982,
"Administrative Controls and Quality Assurance for the Opera-
tional Phase of Nuclear Power Plants.")
V.
ANSI/IEEE-ANS-7-4.3.2-1982, "Application Criteria
for Programmable Digital Computer Systems in Safety Systems of
Nuclear Power Generating Stations."
W.
IEEE 467-1980,  "IEEE Standard Quality Assurance
Program Requirements for the Design and Manufacture of Class 1E
Instrumentation and Electric Equipment for Nuclear Power Generat-
ing Stations."
17.2.4
Supplemental Information
A.
NUREG-0800, USNRC Standard Review Plan, June 1987.
1.
SRP 17.2, "Quality Assurance During the Oper-
ations Phase."
2.
SRP 17.3, "Quality Assurance Program Descrip-
tion."
B.
NUREG/cR-5151, "Performance-Based
Inspections."
C.
WASH 1309, "Guidance on Quality Assurance Require-
ments During the Construction Phase of Nuclear Power Plants,"
USAEC, May 1974.
D.
WASH 1284, "Guidance on Quality Assurance Require-
ments During the Operations Phase of Nuclear Power Plants,"
USAEC, October 1973.
WASH  1283, "Guidance on Quality Assurance Require-
E.
ments During Design and Procurement Phase of Nuclear Power
Plants," USAEC, May 1974.
17-9


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business