Click here to make tpub.com your Home Page

Page Title: USNRC Regulatory Guides, BRP Branch Technical Positions and Appendices
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



GDC 19, "Control Room."
4.
GDC 20, "Protection System Functions."
5.
"Protection Systems Reliability and
GDC 21,
6.
Testability."
GDC 22, "Protection System Independence."
7.
GDC 23, "Protection System Failure Modes."
8.
GDC 24, "Separation of Protection and Control
9.
Systems."
GDC 25,  "Protection System Requirements for
10.
Reactivity Control Malfunctions."
GDC 29, "Protection Against Anticipated Opera-
11.
tional Occurrences."
USNRC Regulatory Guides, BRP Branch Technical Positions
7.2.2
and Appendices
Regulatory  Guide  1.22, "Periodic Testing of Pro-
A.
tection System Actuation Functions."
Regulatory  Guide  1.47,  "Bypassed and Inoperable
B.
Status Indication for Nuclear Power Plant Safety Systems."
1.53,  "Application of the
C.
Regulatory
Guide
Single-Failure Criterion to Nuclear Power Plant Protection Sys-
tems."
1.62, "Manual Initiation of Pro-
D.
Regulatory Guide
tection Actions."
1.75, "Physical Independence of
Guide
E.
Regulatory
Electric Systems."
1.105, "Instrument Setpoints for
Guide
F.
Regulatory
Safety-Related Systems."
1.118,  "Periodic Testing of
Guide
G.
Regulatory
Electric Power and Protection Systems."
1.153,  "Criteria for Power,
Guide
H.
Regulatory
Instrumentation,  and Control Portions of Safety Systems."
SRP  Appendix 7-A, Branch Technical Position ICSB
I.
12,  "Protection System Trip Point Changes for Operation with
Reactor Coolant Pumps Out of Service."
7-5


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business