Click here to make tpub.com your Home Page

Page Title: Modification Control
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1053-93
3.4.7 Modification Control
Modifications to equipment and structures covered by this program should be approved
and controlled in accordance with "Guidelines to Good Practices f or M odif ication
W ork at DOE N uclear Facilities" and the plant modification program.
3.4.8 Procurement
Procurement documents for material, parts, or services for equipment covered by this
program should specify the desired attributes of products and services in sufficient
detail to ensure that equipment reliability is not inadvertently degraded. Purchase
specifications should be in accordance with "Guidelines to Good Practices f or
Procurem ent of Parts, M aterials, and S erv ices at DOE N uclear Facilities."
3.4.9 Material Control
Receipt inspections should be performed to ensure that material meets purchase
specifications before release for use in the plant or as spare stock. Material that fails
to meet purchase specifications may be released for use only when authorized by the
cognizant maintenance or design engineer. This authorization should only be given
when the deviation does not have a significant degrading effect on equipment
performance. Material, parts, and components should be identified and controlled in
accordance with "Guidelines to Good Practices f or M aterial R eceipt, Inspection,
Handling, S torage, R etriev al, and Issuance at DOE N uclear Facilities" and approved
plant material handling and storage procedures. Acceptance, hold, or reject tags should
be used to show the status of items that have been receipt inspected. The storage
environment and the age of stored materials should be controlled in accordance with
DOE Guidelines, approved plant procedures, and manufacturer's recommendations.
3.4.10 Document Control and Records
Instructions, procedures, drawings, and vendor technical manuals for equipment in this
program should be controlled in accordance with approved plant document control
procedures to ensure that they remain current.
3.4.10.1 Satellite files or other suitable means should be established to ensure that
reference materials are readily available at major work centers in the plant.
3.4.10.2 Personnel should report inaccurate procedures and drawings in accordance
with approved plant administrative procedures, proposing an appropriate
correction whenever possible.
18


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business