Quantcast Appendix C: Selected Maintenance Activities and Post Maintenance Tests - Continued - std10650032

 

Click here to make tpub.com your Home Page

Page Title: Appendix C: Selected Maintenance Activities and Post Maintenance Tests - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Appendix C: Selected Maintenance Activities and Post Maintenance Tests - Continued - std10650031
Up
Guideline to Good Practices For Postmaintenance Testing at DOE Nuclear Facilities
Next
Appendix C: Selected Maintenance Activities and Post Maintenance Tests - Continued - std10650033


DOE-STD-1065-94
Appendix C
SELECTED MAINTENANCE ACTIVITIES AND POSTMAINTENANCE TESTS
Maintenance Activity
Recommended Test
Perform maintenance of
emergency diesel generator
(EDG) and related components.
1.
Test automatic-start function.
2.
Check EDG fluid parameters (e.g., lube- oil
level, cooling-water temperature and flow,
governor-control oil system, fuel-oil sampling).
3.
Test EDG automatic protective features
(overspeed, generator differential, low
lube-oil pressure, high crankcase pressure,
etc.).
4.
Test EDG synchronization and load.
5.
Test EDG manual start.
6.
Check diagnostic baseline parameters (e.g.,
vibration, cylinder compression).
7.
Check voltage regulation and frequency.
Perform heat-exchanger maintenance.
1.
Check heat-exchanger parameters
(temperature, flow, external leakage, etc.).
2.
Test heat-exchanger performance (heat
balance).
3.
Check hydrostatic or operational test for tube
and tube-sheet leakage.
Perform piping-system maintenance.
1.
Flush system.
2.
Check ASME code requirements.
3.
Perform pressure/hydrostatic test.
4.
Check integrity of mechanical joints.
5.
Check cleanliness and verify system filled and
vented.
6.
Verify correct fluid-chemical parameters.
7.
Verify that piping supports heat tracing, and
insulation are restored.
8.
Review for unusual pipe displacement.
9.
Ensure that instrumentation lines are attached
to pipe and properly refilled.
C-7