Click here to make tpub.com your Home Page

Page Title: 10 CFR 830.207, DOE Approval of Safety Basis and DOE-STD-1104, with respect to its impact on Department nuclear safety.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1183-2004
c. Discuss the provisions of 29 CFR 1926.65 and 1910.120 for Technical Safety
Requirements.
d. Describe the application of DOE-STD-3011, Guidance for Preparation of Basis for Interim
Operations (BIO) Documents, to nuclear facilities safety basis.
e. Discuss the limitations associated with the safety basis for "certain environmental
restoration activities."
f.
Review a chapter of an environmental restoration/decommissioning activity safety basis.
g. Discuss the unique considerations with respect to control selection for waste management
activities.
18. Nuclear safety specialists shall demonstrate a working level knowledge of 10 CFR
830.207, DOE Approval of Safety Basis and DOE-STD-1104, with respect to its impact
on Department nuclear safety.
Supporting Knowledge and/or Skills
a. Describe the basic purpose and contents of a Safety Evaluation Report.
b. Describe the bases for approval contained in a Safety Evaluation Report.
c. Prepare a Safety Evaluation Report consistent with DOE-STD-1104 for a safety basis
amendment or annual update.
19. Nuclear safety specialists shall demonstrate a working level knowledge of 10 CFR
830.206, Preliminary Documented Safety Analysis, with respect to its impact on
Department nuclear safety.
Supporting Knowledge and/or Skills
a. Describe the application of the requirements of DOE Order 420.1A and its guidance to the
development process for the Preliminary Documented Safety Analyses.
b. Describe the sequencing of the Preliminary Documented Safety Analysis relative to design,
procurement, construction and operation of new facilities.
c. Describe the circumstances when a Preliminary Documented Safety Analysis must be
prepared.
d. Describe the relationship between the PDSA and the design process.
e. Perform a detailed review of a PDSA chapter.
20. Nuclear safety specialists shall demonstrate a working level knowledge of 10 CFR
830.202, Safety Basis and DOE-STD-1027, with respect to its impact on Department
nuclear safety.
Supporting Knowledge and/or Skills
a. Describe when a contractor must establish a safety basis for a facility.
b. Describe the requirements for the safety basis.
15


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business