DOE-STD-3006-95
4.0 ORR Prerequisites: The ORR Implementation Plan should summarize the prerequisites specified
in the approved plan-of-action. It is not the responsibility of the ORR team to develop the
prerequisites but they must understand them and be prepared to verify that the prerequisites have been
achieved at the start of the ORR.
5.0 Overall Approach: Defines the generic approach by which the review will be conducted, and
provides an introduction to the ORR process. The ORR Criteria and Review Approaches (CRAs) will
be defined by the processes described in this section. The definition of the criteria by which findings
will be classified as prestart and post-start should be defined here, as should the method for report
preparation, finding resolution and methods of closure.
6.0 ORR Preparations: Describes any preparations, including team pre-review site visits, document
reviews, etc., that will be undertaken prior to the on-site review. A discussion of qualifications and
training considerations for ORR team members could appear here.
7.0 ORR Process: Describes the actual Criteria and Review Approaches that will be used to review
the defined core requirements of the review. These CRAs should be developed in a format to include
the following items:
A. Core Requirement/Core Objective-Identification of the requirement which will be verified as
having been achieved by the readiness process;
B. Criteria - The specifics by which the core requirements/core objectives will be measured, which
may include regulatory requirements, etc.
C. Review Approach - a definition of what combination of review of documentation, interviews of
personnel, walkdown of systems, and observation of exercises and/or drills that will be conducted
to derive objective evidence by which the team will measure the defined criteria and assess the
readiness of the particular objective or sub-objective;
D. Basis - a discussion of why the particular review is needed;
E. References - those requirements or regulatory standards that apply to this core requirement and
safety documentation that contains the requirements associated with a particular core requirement.
This section may be unnecessary if the information is contained in Section 5.0 and the appendices.