Click here to make tpub.com your Home Page

Page Title: Appendix G: Sample Operations Assessment Report
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-EM-STD-5505-96
APPENDIX G
SAMPLE OPERATIONS ASSESSMENT REPORT
OPERATIONS ASSESSMENT
Activity Name
Location
Date of Assessment
An Operations Assessment of ACTIVITY NAME at ACTIVITY LOCATION was conducted from
DATE OF ASSESSMENT. The members of the assessment team are listed in Attachment 2.
The basis for the graded approach is a matrix of applicability as called for in DOE Order 5480.19.
A matrix addressing applicability HAS/HAS NOT been produced for ACTIVITY NAME.
The findings enumerated in Attachment 1 lead to the following concerns. Although the findings
are listed by the chapter in the DOE Order, the concerns are grouped to assist management
action. Some findings did not rise to the level of a concern.
When reading and interpreting this report the following definitions apply:
- A FINDING is an individual item that does not meet requirements.
- A CONCERN is a determination of a programmatic breakdown or widespread problem
supported by one or more findings.
CONCERNS
ACTIVITY MANAGEMENT
1. Management oversight processes do not ensure implementation of some tank farm policies and
procedures. In some cases, facility practice departs significantly from approved administrative
policies and/or from management expectations. Such areas include lockout/tagout, temporary
modifications, radiological controls, alarm management, and the facility monitoring program.
CONTROL OF OPERATIONS
2. Shift routines at the Computer Automated Surveillance System (CASS) station are informal.
CASS operators do not ensure that alarm status and facility configuration are communicated
between the CASS station and the cognizant tank farm shift managers.
MAINTENANCE
3. Temporary modifications are not controlled in accordance with facility procedures.
145


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business