Click here to make tpub.com your Home Page

Page Title: Required Reading
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-EM-STD-5505-96
APPENDIX G
SAMPLE OPERATIONS ASSESSMENT REPORT
FINDING:
Three of three CASS Operators interviewed could not demonstrate how they reviewed CASS
status log items referenced in the shift turnover checksheet. The shift turnover checksheet
requires use of a status log to review equipment malfunctions and failures,
operations/maintenance and work in progress, system/equipment status, etc. (References: 1, 2)
[Concern: 2]
DISCUSSION: A status log does not exist at the CASS and the status board is not updated
to provide the information required to be reviewed at shift turnover. Note that the
Operating Procedure, TO-020-755, section 5.3.1 requires that each facility maintain a status
log, but this procedure does not cover the CASS.
OPERATIONS ASPECTS OF FACILITY CHEMISTRY AND UNIQUE PROCESSES
REFERENCES:
1. DOE 5480.19, Chapter XIII
2. IP-0842, Vol II, Section 4.13.1
FINDING:
The CASS was not informed that the X Tank Farms tank exhauster was to be shutdown therefore
they did not realize that ten (10) alarms would be received. (References: 1, 2) [Concern: 2]
FINDING:
One of three CASS operators did not know what OSR equipment and associated alarms existed at
the CASS. (References: 1, 2) [Concern: 2]
REQUIRED READING
REFERENCES:
1. DOE 5480.19, Chapter XIV
2. IP-0842 Volume II Section 4.14.1
157


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business