Click here to make tpub.com your Home Page

Page Title: Table 4.10. What-If Analysis of Cooling Water Chlorination System
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1100-2004
Table 4.10. What-If Analysis of Cooling Water Chlorination System
LINE/VESSEL: Cooling Water Chlorination System
December 22, 1992
__ of __
DATE:
PAGE:
SCEN-
COMMENTS
WHAT IF
CONSEQUENCES
SAFETY LEVELS
ARIO
... the system is involved in a
High pressure in chlorine cylinder,
Ignition source control.
1
Verify that area is free from
fire?
fusible plugs melt, chlorine release
unnecessary fuel.
into fire ...
... the wrong material is received Water contaminated, not sterilized
None.
2
Prevention: supplier's procedures.
in the cylinder and hooked up?
- Oil
... the cylinder's fusible plugs
Chlorine release.
None.
3
Purchase and train personnel in
the use of a Cl2 cylinder leak
prematurely fail?
capping kit.
... the pressure check valve fails
Built-in relief valve opens, releasing None.
4
open (both pass chlorine gas)?
chlorine to atmosphere.
... the basin corrodes through?
Chlorinated water release.
Periodic inspection.
5
6a
None.
Eventually low chlorine in water,
... the recirculation pump fails
biological growth.
OR power is lost?
6b
Pressure check valve.
Release of undissolved chlorine to
atmosphere if pressure check valve
fails.
None.
7
Eventually low chlorine in water,
... the chlorine cylinder is run
biological growth.
dry and not replaced?
40


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business