Page Title: Change Notice 1 Review and Approval of Nuclear Facility Safety Basis Documents
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



Change Notice No. 2
DOE-STD-1104-96
November 2005
Change Notice 1
Review and Approval of Nuclear Facility Safety Basis Documents
(Documented Safety Analyses and Technical Safety Requirements)
Page / Section
Change
Entire Document
Safety Analysis Report (SAR) was changed to
Documented Safety Analysis (DSA).
Entire Document
Terminology in the Standard was changed to be
consistent with 10 CFR 830.
Entire Document
Description of DOE review and approval effort was
expanded to include Technical Safety Requirements
(TSRs).
Entire Document
References to DOE 5480.23 were changed to 10 CFR
830.
Entire Document
References to Cognizant Secretarial Officer (CSO)
were changed to DOE Management Official.
Entire Document
References to DOE Order 5480.21, "Unreviewed
Safety Questions", were changed to 10 CFR 830.203,
"Unreviewed safety question process".
p. ii
The address for obtaining copies of this Standard was
changed.
p. v / Table of Contents
New chapter on Approval Bases for Technical Safety
Requirements was added.
p. v / Table of Contents
New section on Technical Safety Requirements was
added to Section 4, "Safety Evaluation Reports".
p. vii / Foreword
New address was provided for beneficial comments.
p. ix / Guiding Principles
Guidance was added regarding the use of other than
safe harbor methodologies.
p. 1 / Applicability and Scope
Guidance for facilities under the Office of Nuclear
Energy, Science and Technology, was deleted.
p. 3 / Sect. 1.1 Responsibilities and
Requirements from 10 CFR 830 for review of safety
Authorities
basis replaced DOE 5480.23 requirements.
p. 10 / Sect. 2.2 Hazard and Accident
Requirements from 10 CFR 830 were added.
Analyses
p. 11 / Sect. 2.4 Hazard Controls
Requirements from 10 CFR 830 were added.
p. 12 / Sect. 2.5 Safety Management
Requirements from 10 CFR 830 were added.
Program Characteristics
p. 12 / Sect. 2.5 Programmatic Control
Guidance on the use of descriptions of institutional
programs in Integrated Safety Management System
documents and site-wide manuals was added.
p. 13 / Sect. 3 Approval Bases for Technical
New section on approval bases for TSRs was added.
Safety Requirements
p. 18 / Sect. 4.10 Technical Safety
New section on documenting review and approval of
Requirements
TSRs in the Safety Evaluation Report (S E R) was
added.