Click here to make tpub.com your Home Page

Page Title: Figure 5-1. Change Control Process
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1073-2003
Configuration Management
Change Control
Process
Identify change
Document proposed
change in change
control package
yes
Design basis
Perform
Perform independent
or safety
design/safety
design/safety
basis changes?
analysis
verification for change
no
no
Can adequate safety
Perform interdisciplinary
Revise or
be met following
technical review
cancel change
the change?
Identify documents
affected by the
yes
Technical Review
design change
5.3.1
Perform
Management Review
management review
5.3.2
yes
yes
USQ review
Perform USQ
Obtain DOE
USQ?
required?
determination
approval
no
no
USQ Review
5.3.1
yes
Perform
Other reviews to
review(s)
be performed?
no
Perform
Implement
Track, update, &
post-modification
through Work
distribute documents
Approve Change
testing & verify change
Control
through document control
is acceptable
FIGURE 5-1 CHANGE CONTROL PROCESS
5-3


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business