| DOE-STD-1120-2005/Vol. 2
READINESS CHECKLIST
PROJECT:
PROJECT MGR:
ACTION
ACCEPTABLE?
ASSIGNEE
Yes
No
k.
Disposal system for radioactive contaminated fluids
5.
Systems and components to be removed are tagged or identified
6.
Lock and tag requirements are completed and documented in
accordance with approved procedures
7.
Breathing air system
a.
Adequate volume
b.
Equipment tested
c.
Air certified
VI.
Support Facilities
1.
Waste processing
2.
Waste packaging
3.
Decontamination (including equipment and personnel)
4.
Medical
VII.
Support Equipment Preparation: Verify the Readiness
of Support Equipment (e.g., Inspections, Maintenance,
and Testing Logs and Documentation Completed)
1.
Heavy equipment test, inspection, and certification
a.
Trucks
b.
Cranes
c.
Bulldozers
d.
Backhoes
e.
f.
Front-end loaders
2.
Waste solidification systems
3.
Volume-reduction equipment
a.
Shredders
b.
Compactors
4.
Decontamination equipment
a.
High-pressure liquid
b.
Liquid abrasive
c.
Dry abrasive
F-6
|