Click here to make tpub.com your Home Page

Page Title: Decommissioning Project Plan
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1136-2004
Guide of Good Practices for Occupational Radiation Protection in Uranium Facilities
10.3.3.4 Decommissioning Project Plan
A decommissioning project plan should be prepared and should include the following:
a. physical, chemical, and radiological characterization data or references to such data,
b. a summary evaluation of decommissioning alternatives for the facility, including the preferred
alternatives,
c. plans for meeting requirements from the environmental review process (NEPA, RCRA,
CERCLA, and SARA),
d. radiological criteria to be used,
e. development of a health and safety plan for decommissioning,
f.
projections of occupational exposure,
g. estimated quantities of radioactive waste to be generated, and
h. detailed administrative, cost-schedule, and management information.
If a contractor will be used to perform the D&D operations, the plan should include detailed technical
specifications for selecting a contractor.
The site characterization survey should provide the necessary information on the type of facility or
land area to be decommissioned and the type and amount of residual radioactive material that must be
cleaned up. Other information to be considered in deciding the appropriate decommissioning alternative
includes the following:
a. the availability of a final disposal facility for the radioactive waste, hazardous waste, or mixed
waste,
10-11