|
| DOE-EM-STD-5503-94
TABLE 3-1
Sample Hazard Assessment: Cleaning the Inside Surface of a Chemical/Radioactive
Contaminated Tank Top Manhole Entry
Step
Hazard
Controls
9.
Cleanup/
Handling of equipment, causing injury.
Dry run.
Decontamination.
Spread of Contamination.
Follow Decon procedures in RADCON Manual.
Use material-handling equipment.
3.6. REFERENCES
29 CFR 1910, Occupational Safety and Health Standards.
1.
29 CFR 1926, Safety and Health Regulations for Construction.
2.
ACGIH Threshold Limit Values for Chemical Substances and Physical Agents and
3.
DOE Order 5480.1B, Environment, Safety, and Health Program for Department of Energy
4.
Operations.
DOE Order 5480.4, Environmental Protection, Safety, and Health Protection Standards.
5.
DOE Order 5480.9, Construction Safety and Health Program.
6.
DOE Order 5481.1, Environmental Protection, Safety, and Health Protection Information
7.
Reporting Requirements.
NIOSH/OSHA Pocket Guide to Chemical Hazards, NIOSH Publication #90-117, 1985.
8.
OSHA Chemical Information Manual, ACGIH Publication #0881, 1988.
9.
10. Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities,
NIOSH/OSHA/USCG/EPA, October 1985 (Four-Agency Document).
11. DOE Order 5480.19, Conduct of Operations.
3-9
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |