DOE-HDBK-3010-94
Appendix B; Plutonium Recovery Facility
g-Level
Probable Damage
0.26
Gloveboxes may begin to sag. Spalling of external walls
possible. From 5% to 10% of the plutonium process tanks in
first story tank farm fail.
0.30
Building wide failure of tanks other than plutonium process
tanks. All gloveboxes sag, and 10% to 20% of the plutonium
process tanks fail. Possible large cracking of internal non-shear
concrete walls. It is expected that the building shell will remain
intact.
The statement that the building shell will remain intact is stated to be an "expectation" as
opposed to a "conclusion" in the Brown and Associates study because of concerns that the tie
spacing in columns might be too large. Even with this concern, the majority of the columns
in the building were judged adequate. However, column A-17, the support unit located at
the L-shaped hinge on the north face of the building, was considered a potential problem.
The irregular shape of the PRF structure allows a significant moment to develop at this
location and it was considered unlikely but possible for column A-17 to exhibit brittle shear
failure. If such a failure occurred, Brown and Associates estimated dominoing failures could
lead to partial collapse of the building around the cafeteria, "clean" office space, and the feed
preparation, dissolving, and sampling gloveboxes. At this point, the moment characteristics
of the new building shape would be considered survivable for the remainder of the structure.
A project to provide additional support for column A-17 was developed as a result of this
study, but the estimated funding has not been made available.
Based on column and beam locations, this partial collapse case would be expected to include
the following process equipment in the collapse zone: (1) the vessel vent scrubber, knock-
out tank, and blowdown tank; (2) the impactor, weighing and batching, and furnace stations
of the feed preparation glovebox; (3) the metal dissolving glovebox; (4) the back-end half of
the residue dissolving glovebox; and (5) the sample glovebox. Outside the partial collapse
zone, the base conclusions of the study would remain valid (i.e., gloveboxes would remain
upright, but limited sagging could occur, glovebox piping and electric connections could
fail).