Click here to make tpub.com your Home Page

Page Title: Appendix 11 Prestart and Post-Start Determination Criteria for Operational Readiness Reviews cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-3012-96
2. Does the loss of operability of the item require operator action in less than ten (10) minutes to
prevent or mitigate the consequences of events described in the Safety Analysis?
3. Does the loss of operability of the item cause operation outside the TSR/OSRs or Safety
Analysis?
4. Does the loss of operability of the item result in a reduction of the margin of safety as
described in the Safety Analysis?
5. Does the issue indicate a lack of control which can have a near term impact on the operability
or functionality of safety related systems?
6. Does the issue involve a violation or potential violation of worker safety or environmental
protection regulatory requirements which poses a significant danger to workers, the public, or
of environmental insult or release?
If the response to any of the above questions is yes, the item should be considered a startup
item.
APPENDIX 11-2


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business