Interviews Conducted:
Emergency Services Manager NMPD/Reactors
Manager of Emergency Services Technical
Administrative Assistant to Operations Management
Lead Emergency Preparedness Coordinator
DOE Area Representative EP
Emergency Management Preparedness Coordinator
Emergency Management Preparedness Coordinator
Shift Advisor on loan to Emergency Planning
Administrative Assistant to Operations Management
Shift Performance Evolution: Facility DOE-HQ-ORE Drill
Discussion of Results:
Records Reviewed: The Emergency Preparedness Program for the Facility (the original used the name of
the facility) was reviewed to ensure that the emergency plan and implementing procedures and instructions
for the Facility, and applicable portions of the site plan, complied with or have Compliance Schedules
Approvals (CSAs) for DOE 5500 Series Orders. The following DOE 5500 Series Order Compliance
Packet CSAs were reviewed:
XXX-DOE-5500.3A-CSA-93-007A; Personnel accountability was demonstrated for the facility personnel
during the Emergency Preparedness Drill X-F Facility DOE-HQ-ORE Evaluated Drill [ . . . "must be
preformed in 30 minutes not to exceed 45 minutes" . . . 5500.3A.11.c.(6)(c)]. The Facility has implemented
personnel accountability in procedure "Personnel Accountability" [EPIP-XXXX-203 Rev. 2] using a newly
established manual badge system.
Another issue of this CSA, is personnel accountability for Outside Facilities, XXX-F, XXX-F, and the area
which uses a supervisor accountability system . The supervisory accountability system is not consistently
proceduralized for the facility. In addition, neither the manual badge system nor the supervisor
accountability system have been found reliable for personnel working on the roof. A facility compensatory
measure is visitors and personnel are required to respond to direction from the AEC. Also, personnel
working on the roof are required to notify the Control Room when entering and exiting. A facility
procedure addressing the above points will ensure a consistent approach to Area accountability.
Offsite Response Interfaces: Offsite Response Interface is the responsibility of the Site Emergency
Preparedness Organization, it is not an issue for Emergency Preparedness Organization. XXX-DOE-
5500.2B-CSA-93-072 for Consolidated Emergency Response Facility is a site not and a facility issue.