|
| ![]() DOE-HDBK-1002-96
APPENDIX A
Chiller Systems
Cadmium Liquid Waste Systems
Sources
Schematic
Transfer routes
Refrigerant
Sumps
Hot gas bypass
Flush connections
Temperature ranges
Off-gas system
Lead/lag operation
Controls
Anti-recycle timer
Alarm response.
Abnormalities
High Fluoride Liquid Waste Systems
Pressure
Chemical hazards
Water circulation
First aid treatment
Chiller pump operation
Reagent
Closed-loop
Complexing
Open-loop
Sources
Start-up
Chemical concentrations
Operation
Problems
Shutdown
Transferring
Safety features
Sumps
Startup-delay circuit
Flush connections.
Low-flow switches.
A.12 Cranes and Hoists
Designated signaler
Lift the load
Electrical disconnects
Move the load
Controller
Set the load down
Monthly checks/inspections
Park the unit
Safety hazards
Plug a load
Attach the load
Electrical failure.
A-16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |