Click here to make tpub.com your Home Page

Page Title: Cleaning and Testing of PPE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1092-2004
2.12.3 CLEANING AND ELECTRICAL TESTING OF PPE
Rubber-insulated PPE issued for use shall receive periodic cleaning and electrical testing in
accordance with the requirements of the appropriate ANSI/ASTM standards listed in the
References section of this handbook. The intervals of retest for rubber goods issued for service
shall not be more than 6 months for gloves and 12 months for sleeves and blankets. Gloves or
sleeves that have been electrically tested but not issued for service shall not be placed into
service unless they have been electrically tested within the previous 12 months.
2.12.3.1
TESTING
All testing methods, apparatus, and facilities shall meet the applicable ANSI/ASTM Standard.
The method used and the results of such tests shall be documented and made available for
inspection.
2.12.3.2
TESTING APPARATUS
Testing apparatus shall be operated and maintained by personnel trained for such work.
Calibration schedules and procedures for calibrating testing apparatus are recommended to be
in accordance with ANSI C39.1.
2.12.3.3
RETESTED PPE
Retested rubber-insulated PPE shall be identified to indicate the date of the latest test or date of
retest in accordance with the appropriate standard. Manufacturer's recommendations shall be
followed on the type of paint or ink to be used.
2.12.4 LIVE-LINE TOOLS
Live-line tools shall be cleaned and inspected before use and receive a dielectric test whenever
their insulating value is suspect. A record of the testing of live-line tools shall be maintained.
2.12.4.1
FIBERGLASS-HANDLED TOOLS
Fiberglass-handled tools shall be tested by the manufacturer at 100 kV per ft of length. The in-
service test shall be 75 kV per ft.
2.12.4.2
WOODEN-HANDLED TOOLS
Wooden-handled tools shall be tested by the manufacturer to 75 kV per ft of length. The in-
service test shall be 50 kV per ft.
2-15


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business