| DOE-HDBK-1099-96
APPENDIX B - EXAMPLE DRILL SCENARIOS
Title:
Containment Argon Leak From R-36
Drill Number: 007-02
Revision Number: 0
SECTION I.
INITIAL CONDITIONS
PLANT MODE/DECAY HEAT:
Any
SYSTEM/EQUIPMENT:
82, 25\CTMT H&V E68/69, R3/4
WATCHSTATIONS:
ERT, RPT, CT, Control Room, SS
SPECIAL EQUIPMENT:
R-36 on line
PRE-DRILL NOTIFICATIONS:
IEM Cell Shift Supervisor
IEM CELL IMPACT:
Inerted with R-36 on line.
SPECIAL CONDITIONS AND
INSTRUCTIONS:
None
SECTION II.
PRECAUTIONS and LIMITATIONS
ABORT LIMITS:
If containment pressure approaches + 1 psig.
OPERATIONAL LIMITS:
None
TECH SPEC LIMITS
OR PRECAUTIONS:
IEM Cell 17.3.7.2.3
DRILL TEAM DUTIES:
Monitor RPT, ERT and Control Room responses.
REFERENCES:
Operation of IEM Cell Purification Unit, R-36, SN-82.1-11,
H-4-11125, IEM Cell Argon Purification System. CTMT
H&V, H-4-11502, 11547
SECTION III.
DRILL INITIATION
The drill is initiated by a drill team member reporting as an RPT to the Control Room that a
smear of 20,000 CPM (Beta, Gamma) was found in Cell 572 near R-36.
B 1-2
|