Click here to make tpub.com your Home Page

Page Title: Table 4.5 Checklist Analysis of Dock 8 HF Supply System
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1100-2004
Table 4.5 Checklist Analysis of Dock 8 HF Supply System
MATERIAL
Do all raw materials continue to conform to original specifications? Yes. The cylinders are
ordered with the same anhydrous HF specification used since startup.
Is each receipt of material checked? No. There have been no problems with the supplier, so no
such check has been considered. Investigate consequences of receiving material other than HF.
Consider adding such checks on HF receipts.
Does the operating staff have access to Material Safety Data Sheets? Yes. All staff are
familiar with the process chemistry, including the hazards of HF.
Is fire fighting and safety equipment properly located and maintained? Yes.
EQUIPMENT
Has all equipment been inspected as scheduled? Yes. The maintenance personnel have
inspected the equipment in the process area according to company inspection standards. Given
the corrosivity of HF, inspections may have to be more frequent.
Have pressure relief valves been inspected as scheduled? Yes.
Have rupture discs been inspected (for having blown) as scheduled? Yes. Though none have
failed, procedure calls for inspection of rupture disc and installation after maintenance.
Are the proper maintenance materials (parts, etc.) available? Yes. They include spare pigtails
for the supply cylinders as well as properly rated rupture discs. Other items must be ordered.
PROCEDURES
Are the operating procedures current? Yes.
Are the operators following the operating procedures? Yes. No significant violations of
procedures have been noted.
Are new operating staff trained properly? Yes. Training includes a review of the PrHA for this
process and familiarization with MSDSs.
How are communications handled at shift change? If an HF cylinder needs to be changed out
near a shift change, the change is scheduled to be performed by either, but not both, shifts.
Is housekeeping acceptable? Yes.
Are safe work permits being used? Yes.