| Exhibit 2.10
DOE-HDBK-1101-96
Change Management Plan
Task
Required
Responsibility
Completed
Y/N
Name
Organization
Date/Initials
Process Hazard Review (PrHA)
Safety Design Review
New/Revised Operating Procedures
New/Revised Maint. Procedures
HAZCOM Review
Operator Training
Maint./Contractor Training
Operating Manual Update
Maintenance Record Update
Process Flow Diagram Update
P&ID Update
Equip. Test/Insp. Record Update
Spare Parts Review
Environmental Reqmts Review
Basic Design Review
Other:
Note: If change is made on an emergency basis during an off shift, request for change should be routed to the Change
Management Committe as soon as possible. The Change Management Committee will be responsible for ensuring that
the risk of chnage is evaluated and documented throught the normal change process.
All Required Reviews Completed
Engineering Manager _____________________________
Date _______________