Click here to make tpub.com your Home Page

Page Title: Corresponding DOE Programs and Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1101-96
Equipment in contact with HHCs forms the first line of defense in preventing uncontrolled
catastrophic HHC releases. The second line of defense is typically a combination of containment
and safety systems. For example, controlled releases of chemicals may be made to surge or over-
flow tanks, to diked areas or controlled drainage systems, or through pressure relief valves or vents
to scrubbers, filtration systems, or flares. Second line systems also include chemical detection
systems and fire detection and suppression systems. The mechanical integrity program must ensure
that components in both primary and secondary lines of defense are designed, installed, and operated
properly.
Corresponding DOE Programs and Requirements
Most contractors already have preventative maintenance programs for their facilities. These
programs must comply with maintenance management requirements contained in DOE O 420.1,
FACILITY SAFETY, and DOE O 430.1, LIFE CYCLE ASSET MANAGEMENT which address
most requirements of the Mechanical Integrity element with little modification. DOE's quality
assurance program described in DOE 5700.6C helps to ensure that process equipment meets
specifications and is properly installed. Configuration control and management requirements found
in DOE O 430.1 also help ensure the mechanical integrity of process equipment. The DOE safety
analysis process can help to focus mechanical integrity programs on safety critical systems,
components, and structures.
Documentation Requirements
Written procedures are required for maintenance operations including the inspection, testing,
maintenance, and repair of process equipment. Inspections and tests must be documented and must
include the date, the name of the person performing the inspection or test, identification of the
equipment examined or tested, the nature of the test or inspection, and results. Deficiencies must be
corrected before the equipment is returned to service, or it must be tracked to ensure that corrective
action is taken in a safe and timely manner. A system must be in place to track, address, and close
out deficiencies identified during inspection and testing. Routine maintenance activities should also
be documented.
Documentation of the training of maintenance workers on the process, related hazards, and appli-
cable procedures should be consistent with documentation requirements noted in Section 2.5.
Minimum Implementation Criteria
Maintenance and quality assurance programs are crucial for fabrication, installation, and repair of
process equipment. When inspection and testing identify conditions outside of safety limits,
deficiencies must be repaired before operations are resumed. If it is not possible to stop operations,
actions must be taken to ensure safe operations so that corrective actions can be made in a safe and
timely manner. The program to ensure the mechanical integrity of process equipment should con-
tain:
written maintenance procedures [Q75,Q76];
inspection and test procedures;
trained process maintenance personnel;
72


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business