Click here to make tpub.com your Home Page

Page Title: Preparation of Equipment/Materials
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1106-97
Lesson Plan
Instructor's Notes
5.
Waste
Receptacles for radioactive waste should be located
by the work station so that you may conveniently
dispose of waste without further contamination of the
work area.
State that later in the
C.
Preparation of Equipment/Materials
course the selection and
1.
Assemble survey meters
use of the proper
instruments will be
The survey meter should be turned on and located in
covered (Section VI).
close proximity to the work station. A pre-
operational check is necessary before use to ensure
the meter is working properly. Position the detector
so it is directed toward your work area. This will
enable you to conveniently monitor your hands as
you work and also can indicate when materials are
removed from shielded containers. Always work
with the audio turned on. Your safety and the safety
of others must take priority over the concept that the
sound may be disturbing to others. Know the
location of the nearest phones. Post the Radiological
Control Organization phone number nearby.
2.
Equipment preparation
Use dedicated equipment/tools when appropriate.
Cover/tape tools or equipment used during the job to
minimize radioactive contamination.
19


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business