|
| DOE-HDBK-1108-97
Radiological Training for Accelerator Facilities
Instructor's Guide
Lesson Plan
Instructor's Notes
b. Facility-specific: Facility-specific active
Show active controls.
engineered control devices.
B.
Administrative Controls.
EO-11 IDENTIFY engineered
and administrative controls at
Programs and activities which personnel must
accelerator facilities.
implement to provide protection from hazards.
1.
Search and secure (sweep) procedures.
These are procedures used to verify that no
personnel remain in a beamline enclosure when
it is being prepared to receive beam.
2.
(Facility-Specific) search procedures.
Explain facility-specific search
procedures.
3.
Controlled access procedures (including key
controls).
Procedures that allow personnel to access a
beamline enclosure while it remains
interlocked. There is no physical search of the
area before the beam is restored.
4.
(Facility-Specific) controlled access
procedures.
26
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |