|
| DOE-HDBK-1139/3-2003
Sources10
Consolidated Requirements
4.7 Post-Incident Requirements Predetermined criteria for
DOE O 151.1A, Chapter IV,
termination of emergencies shall be established.
sec. 5b
29CFR1910.120(b)(o);
implement appropriate decontamination procedures. If it is
29CFR1910.120(q)(3)(ix);
determined that it is necessary to remove hazardous
29CFR1910.120(q)(11)
substances, health hazards and materials contaminated with
them (such as contaminated soil or other elements of the
natural environment) from the site of the incident, the
employer conducting the clean-up shall comply with one of
the following:
meet all the requirements of paragraphs (b) through (o)
of 29CFR1910.120 ; OR
where the clean-up is done on plant property using plant
or workplace employees, such shall have completed the
training requirements of section 4.2 herein and other
appropriate safety and health training made necessary by
the tasks that they are expected to perform such as the
use of personal protective equipment and
decontamination procedures. All equipment to be used
in the performance of the clean-up work shall be in
serviceable condition and shall have been inspected
prior to use by a qualified person.
4.7.2 Recovery shall include notifications associated with
DOE O 151.1A, Chapter III,
termination of an emergency and establishment of criteria for
sec. 5.b
resumption of normal operations.
4.7.3 Following termination of emergency response, and in
DOE O 151.1A, Chapter IV,
conjunction with the Final Occurrence Report (see DOE O
sec. 3.b(4)
232.1A), each activated Emergency Management Team shall
submit a final report on the emergency response to the
Emergency Manager for submission to the Director of
4.7.4 Provide for investigation of emergency root cause(s) and
DOE O 151.1A, Attachment 1,
corrective action(s) to prevent recurrence in accordance with
#11
Departmental requirements (e.g., see DOE O 225.1A and
DOE O 5480.19).
4.7.5 Respond to all external evaluation, appraisal, and assessment
DOE O 151.1A, Attachment 1,
findings within 90 days of receipt of findings.
#14
5.0 Source Documents
DOE O 151.1A, "Comprehensive Emergency Management System".
DOE O 225.1A, "Accident Investigations".
DOE O 5480.19, "Conduct of Operations Requirements for DOE Facilities".
94
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |