C.3 Multiple-Choice Test Item Examples
Satisfactory:
Test item:
After a long refueling outage, a reactor startup is performed, and criticality is
achieved in the source range. How would you hold reactor power level constant (in
the source range) for 8 hours while surveillances are conducted? (2 points)
(a) Adjust rods
(b) Adjust boron concentration
(c) Adjust reactor coolant system temperature
(d) No adjustments required.
Answer: (a).
Unsatisfactory:
Test item:
During a cold S/U, a long refueling outage, with power level below the point of adding
heat, you are asked to hold the reactor power level steady for several hours while
surveillances are being conducted. During this period of time you may be doing any
of the following to hold power constant. Pick the best answers:
(a) Withdrawing rod slowly
(b) Inserting rods slowly
(c) Diluting boron slowly