Click here to make tpub.com your Home Page

Page Title: Appendix B On-The-Job Training/Evaluation Guide cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1206-98
APPENDIX B
ON-THE-JOB TRAINING/EVALUATION GUIDE
ADMINISTRATIVE INFORMATION
TEST ID# 00000000000110-SP
REV.# 0
PAGE 1 OF 7
(1) TASK #:
TASK TITLE:
AVG. TIME TO PERFORM
00000000000110
REPLACING SPARK PLUGS
0.5 HOURS
(11)
PERFORMANCE EVALUATION
Action Step
Standards
*
P
A1.
Obtain
Trainee obtained the latest revised copies of
C
references.
the procedures
S
P
A2.
Remove the
All the remaining steps are in accordance with
boot
procedure #110A. Did not tug on the wire,
twisted gently off the plug.
P
A3.
Remove any
So that none will fall onto the hole.
S/C
dirt
P
A4.
Remove the
The correct socket is seated straight on the
S/C
plug
plug and turned counterclockwise.
P
A5.
Determine the
Plug determined to require replacement
S/C
condition of
the plug.
P
A6.
Gap the plug
Gap is correct for type of plug, either 0.025 -
S/C
0.027" or 0.033 - 0.035".
P
A7.
Install the plug
Tightened 1/4 turn beyond finger tight in the
S/C
clockwise direction.
P
A8.
Install the boot
Twisted gently onto the plug
S/C
P
A9.
Used
Procedure was out and referred to for each
C
Procedure
step
(12)
CODES
(S)
Sequence is important. This step must be performed only after preceding step(s)
(C)
Critical step. Failure to meet standard for this item constitutes failure of evaluation.
P & S refer to OJT performance evaluation levels of Perform and Simulate.
B-8


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business