DOE-HDBK-3027-99
b. The team members take actions required to achieve the qualification to perform the
review as specified by the Team Leader.
c. The team members will conduct the assigned portion of the verification following the
Review Plan under the supervision of the Team Leader.
d. The team members will support the preparation of the report and the recommendations to
the Approval Authority as required by the Team Leader.
6.3 Conducting the ISMS Verification
6.3.1 Appointing the Team Leader
The Approval Authority will appoint the Team Leader for the ISMS verification from a list of
Senior Technical Safety Managers approved by the Director, Safety Management Implementation
Team. Within the Letter of Appointment, the Approval Authority should define the scope,
expectations, and desires for the ISMS verification. Since the ISMS verification may be
conducted in two phases, defining the expectations for each phase of the ISMS verification in a
separate letter is appropriate. The quality of the review and the degree to which it is successful is
significantly influenced by the level of detail and specificity with which the expectations for the
review are defined by the Approval Authority. A sample format for an Approval Authority Letter
of Appointment is included as Appendix 4.
6.3.2 Team Leader Considerations for ISMS Verification Preparations
In preparing to conduct ISMS verifications, the Team Leader must make several decisions shortly
after he/she is designated. There are a number of key areas to address. Significant among these
are establishing the relationship and determining the requirements of the Approval Authority,
selecting and training the team, establishing relationships with the contractor, and developing the
basis or approach on which to prepare the review plan. The following is a discussion of some of
the more critical decisions that the Team Leader should make soon after being designated to set
the stage for a successful verification. The Lessons Learned provided in Appendix 5 should be
consulted to assist in developing possible approaches to making these decisions. The Lessons
Learned provide, in detail, an historical record of several pilot ISMS verifications and should give
some insight into possible ways to address key questions.
6.3.2.1 Determining the Interface with the Approval Authority
It is important to establish an effective relationship with the Approval Authority. The Team
Leader should gain a good understanding of the scope and expectations for the review and should
establish the mechanisms with which he/she will update the Approval Authority on the status of
review preparations. Items such as the sequence of the review(s) (Phase I, Phase II, Combined
Phase I/II decisions), establishment of the schedule, dedicated team member selection,
establishment of contractor interfaces, and development and approval of the review plan are
subjects for which the Team Leader and the Approval Authority should have complete
agreement. It is also important that the Approval Authority support and assist the Team Leader
in gaining the dedicated resources necessary to ensure that the verification is successfully
16