Click here to make tpub.com your Home Page

Page Title: Scope
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-3027-99
Applicable Documents: This section lists references directly applicable to the methods and
processes described in the handbook.
Definitions: This section supplements the Glossary of Appendix A of Volume II of the ISMS
Guide, DOE 450.4-1, and provides the meaning of the terms and statements used in the
handbook. The description or definition of the terms have been expanded to be specific to the
intended meaning in this handbook. The usage in the handbook is consistent with the usage in
other DOE documents.
General Guidance: This section provides a summary of the actions, responsibilities, decisions,
and documents associated with ISMS verifications. Recognizing that each site, facility, or
activity will have an ISMS unique to its specific needs, this section provides the general sequence
of review actions to be followed. The section also contains general information on the
expectations for the ISMS verification.
Detailed Guidance: This section describes suggested methods and techniques which the Team
Leader and the team should consider when preparing for and conducting ISMS verifications.
Appendices: The appendices contain detailed information useful to the ISMS verification Team
Leader and individual ISMS verification team members or line managers to help them in the
preparation for the review process.
X Appendix 1 contains a list of Core Expectations for the review.
X Appendix 2 contains a Criteria and Review Approach Document (CRAD) template for the
Phase I ISMS verification.
X Appendix 3 contains a Criteria and Review Approach Document (CRAD) template for the
Phase II ISMS verification.
X Appendix 4 contains a sample Approval Authority Letter of Appointment to the Team
Leader.
X Appendix 5 contains Lessons Learned from the first ISMS pilot verifications.
X Appendix 6 contains a sample format for the documentation of team member qualifications.
X Appendix 7 contains a Writer's Guide which provides assistance in documenting the ISMS
verification and preparing the final report.
2.0 SCOPE
DOE M 411.1, MANUAL OF SAFETY MANAGEMENT FUNCTIONS (LEVEL I FRAM), is
the DOE directive that assigns responsibilities to approve safety management system descriptions
and revisions to the Head of the Contracting Activity. The Functions, Responsibilities, and
Authorities document (Level II FRAM) assigns flow down requirements to the Principal
Secretarial Officer (PSO) and field elements. Responsibilities as Head of the Contracting Activity
2


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business