Click here to make tpub.com your Home Page

Page Title: Emergency Management Operations cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-5504-95
Source
Applicability &
Reference
Plan Element
Plan Reference
EMG-ERO
b.
Each facility or activity with the potential for an
______________
C.2.g
operational emergency must, at all times, have a normal
operating (on-shift) staff position with full authority and
responsibility to implement the emergency response plan
(e.g. "Emergency Director" or similar title).
40 CFR
(1) A person qualified to fill this position should be
______________
262.34(d)(5),
onsite at all times. For facilities where there is no
264.52, 264.55;
operating shift outside of the normal work day, an
EMG-ERO
off-hours alternate should be designated from an
C.1.d;
adjacent facility, the site organization, or other
EMG-F/C 5.1.2
organization such as the fire department. In such
cases a facility staff member should be on call to
assume emergency direction as soon as possible.
EMG-ERO
(2) This position should have the full authority and
______________
C.3.a
responsibility to perform or oversee the following
functions: classify the emergency, carry out initial
notifications, implement protective actions onsite,
issue predetermined offsite protective action
recommendations, and initiate response by onsite
emergency response resources.
40 CFR
(3) For RCRA-regulated hazardous waste facilities, the
______________*
262.34(d)(5),
person filling this position should be thoroughly
264.52, 264.55
familiar with all aspects of the facility's contingency
plan, all operations and activities at the facility, the
location and characteristics of waste handled, the
location of all records within the facility, and the
facility layout.
DOE 5500.2B
c.
Each facility plan should provide for activation of
______________
11.a(2);
appropriate personnel and resources at each emergency
DOE5500.3A
classification, consistent with DOE Order 5500.2B, Sec.
11.c(10)(b);
11.a. Activation and staffing of the EOC and other
EMG-EXEC
emergency facilities should be documented in
Crit. H.1, J.1;
procedures. The plan should provide that upon
EMG-N
declaration of the appropriate emergency classification:
D.2.e.5.
15


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business