  | ![]() DOE-HDBK-5504-95 
Source 
Applicability & 
Reference 
Plan Element 
Plan Reference 
29 CFR 
1910.38(a), 
b. 
The emergency plan should be supported by 
1910.96(f), 
procedures assuring timely sheltering and/or 
1910.165(b), 
evacuation of workers, including predetermined 
1910.120(q)(2)( 
guidance, procedures, assembly areas, 
iv-vi); 
transportation methods, and routes. These 
40 CFR 
procedures should include: 
264.52(f); 
DOE 5500.3A 
(1) Identification of conditions that may require 
11.c.(6)(c); 
emergency actions to protect workers; 
EMG-F/C 7.4; 
______________ 
EMG-EXEC 
(2) Provision for promptly warning workers of the 
Crit. 3.1, 
emergency, so as to allow time for protective 
3.5; 
action, including: 
EMG-PA 
______________ 
C.4, C.5.a; 
(a) An alarm system capable of being 
EMG-FE E.3.a, 
perceived above ambient noise or light 
E.3.d, E.6 
levels by personnel in the affected area; 
______________ 
(b) An alarm signal that is distinctive and 
recognizable as a signal to take protective 
action; and 
______________ 
(c) Procedures for activation of the alarm 
system. 
(d) In areas where radiation hazard may 
______________ 
require immediate evacuation, an alarm 
system conforming to the requirements of 
______________* 
OSHA requirements 29 CFR 
1910.96(f)(1-3), including automated 
activation, backup power supply, 
reliability, and testing regime. 
(3) Provision for carrying out protective measures, 
including: 
(a) As appropriate, designated shelter areas, 
______________ 
capacities, and circumstances for use. 
______________ 
51 
 | 
| 
 