Click here to make tpub.com your Home Page

Page Title: Action and hold point verification sign off in the same action step
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1029-92
successive action steps are normally designated as hold points. Hold points may
involve quality assurance, health physics, engineering, or other inspectors.
EXAMPLE 4-24. Action and hold point verification sign off in the
same action step.
Hold Point:
[3]
Torque head bolts with torque wrench set at 90 foot-pounds.
QA Inspector
[9]
Include places for entering initials or signatures to identify persons recording data
when presenting action steps in tables.
EXAMPLE 4-25. Sign off of a series of data points.
Parameter
Tolerance
As Found
As Left
Initials
Pressure
290 psig (285
to 295)
IV
350EF (345 to
Temperature
355)
IV
Level
20 ft (19.5 to
20.5)
IV
4.13.3
Sign Off or Check Off of Conditional Action Steps
In some instances, performing an action depends on a condition or combination of
conditions. Conditional action steps are introduced by the words IF or WHEN and are
followed by an action.
[1]
Provide a space for the user to mark conditional action steps where a sign-off or
check-off is desired. Typical entries indicating the appropriate action was taken
56


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business