| DOE-STD-1029-92
Appendix B
SOP-618-4
Revision 0
Approved October 22, 1991
Page 5 of 16
3.3
Approvals
[1]
Consult with, and obtain permission from, your supervisor
before beginning performing this procedure
Supervisor Initials
4
RESERVOIR CHECK-IN AND ACTUATOR REMOVAL
NOTE:
SOP-618-3, "Receiving Reservoirs", is used for receiving and
unpackaging reservoirs.
4.1
Checking in the Received and Unpackaged Reservoirs
[1]
Complete Check Sheet/Data Sheet (Appendix A) for each
received and unpackaged reservoir in the hood.
[a]
Record the serial number of the reservoirs
[b]
Record the reservoir type
[c]
Verify that reservoir is unloaded and mark verification
on check sheet
[d]
Verify that reservoirs are acceptable to bury by ensuring that
the status is "NRR" or "NWR" in the computer system.
Supervisor:
[2]
Verify that the serial number(s) on the Check Sheet/Data Sheet
(Appendix A) match the reservoir(s) which have been unloaded.
B-6
|