Click here to make tpub.com your Home Page

Page Title: Approvals
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1029-92
Appendix B
SOP-618-4
Revision 0
Approved October 22, 1991
Page 5 of 16
3.3
Approvals
[1]
Consult with, and obtain permission from, your supervisor
before beginning performing this procedure
Supervisor Initials
4
RESERVOIR CHECK-IN AND ACTUATOR REMOVAL
NOTE:
SOP-618-3, "Receiving Reservoirs", is used for receiving and
unpackaging reservoirs.
4.1
Checking in the Received and Unpackaged Reservoirs
[1]
Complete Check Sheet/Data Sheet (Appendix A) for each
received and unpackaged reservoir in the hood.
[a]
Record the serial number of the reservoirs
[b]
Record the reservoir type
[c]
Verify that reservoir is unloaded and mark verification
on check sheet
[d]
Verify that reservoirs are acceptable to bury by ensuring that
the status is "NRR" or "NWR" in the computer system.
Supervisor:
[2]
Verify that the serial number(s) on the Check Sheet/Data Sheet
(Appendix A) match the reservoir(s) which have been unloaded.
B-6


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business