| DOE-STD-1029-92
Appendix B
SOP-618-4
Revision 0
Approved October 22, 1991
Page 9 of 16
5.2
Preparing Reservoirs with a Stem that CANNOT be removed with Pliers
IF the reservoir has a wafer or stem that cannot be removed with pliers,
[1]
THEN perform the following steps:
(A lengthy series of steps has been omitted here. The omitted steps provide no
further exemplary guidance for producing a procedure)
6
PLUG WELDING
[1]
Ensure that these parts are available for use:
A.
one 0.275 inch electrode
B.
reservoir plug pieces (Part No. 14678), and
C.
an appropriate weld fixture (identified in Section 3.2)
[2]
Start up welder.
[3]
IF welding plugs for the first time this week,
OR an electrodes has just been changed
OR a fixture has just been changed,
THEN GO TO SOP-618-23, performing a test weld
AND RETURN TO this procedure, Section 6, PLUG WELDING step [4]
[4]
Move the reservoir to the plug welding station.
[5]
Obtain a clean conical plug piece (Part No. 14678).
B - 10
|