DOE-STD-1034-93
EXAMPLE DAILY ORDER
Initial/date after Review:
Allen
/
To:
All Supervisors
Johnson
/
From:
Area Manager
Jones
/
Duration:
Jan. 17, 1992 at 5:00 pm to
Pratt
/
Jan. 18, 1992 at 5:00 pm
Smith
/
Turner
/
Daily Orders
1.
A copy of a new procedure has been placed in the Required Reading File:
OP-EV-0082,
Pumping Out Evaporation Pit, 101-C. Ensure all applicable personnel have reviewed this
procedure prior to performing the evolution or shift completion.
2.
JONES - Lock out No. 1 air compressor in 101-1A per lockout order OP-92-531 for
overhaul to be ready to work 1/18/92 at 7:30 am.
3.
A shipment of low level waste (LLW) is expected during second shift. After receipt,
begin characterization of waste for emplacement. Contact the Operations Manager if
shipment has not arrived by 6:30 pm.
4.
Review long-term orders. A new order outlining the work activities for the upcoming
maintenance period is in effect.
General Information:
1.
See attached 1/13/92 Safety Committee meeting minutes. Post in Briefing Room and
Lunchroom.
A-3