|
| DOE-STD-1039-93
h.
Operational testing is performed following maintenance to demonstrate that equipment and
systems are capable of performing their intended function.
i.
A system is in place to control temporary modifications to facility equipment or systems.
j.
A document control system is in place that ensures operating personnel have the latest
revision to documents necessary for proper control of equipment and systems.
4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |