Click here to make tpub.com your Home Page

Page Title: Design Output Documents
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOESTD107393
-
Heat transfer analysis
-
Pump/system performance analysis
-
Pressure/vacuum relief valve sizing
-
Sump capacity
-
Cooling water flow rates
-
Equipment performance calculations
-
Corrosion/erosion allowances
-
Tank sizing and wall thickness calculations
-
Pipe sizing/flow analysis
-
System design/operating pressures and temperatures
-
Pump brake horsepower requirements
-
Valve actuation and check valve closure times
-
Vibration data
-
Thermal expansion data
-
Design cycles for equipment and systems
-
System resistance
Identification and Consideration of Vendor Information
-  Vendor equipment allowable loads
-  Vendor equipment functional, seismic, and environmental qualification
-  Vendor equipment installation and maintenance requirements
-  Vendor standard component load capacities
-  Pressure ratings
Correspondence, meeting minutes, and other documents pertaining to design evaluations and
considerations
Design Output Documents.
System Descriptions, Modifications Descriptions
Specifications
-  Component
-  Material
-  Design
-  Installation Procurement
-  Piping classification list
-  Valve mark number list
Facility Component Lists
-  Valve Lists
-  Equipment Lists (Q-Lists)
-  Electrical Load Lists
-  Setpoint Lists
-  Fuse and Breakers Lists
-  Instrument and Controls
-  Environmental Qualification
Safety Analysis Report Changes
II-B-5


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business