| DOE-STD-3007-93
EXAMPLE # 5
Contingency analysis for a hypothetical process area operation involving
loading of fissile parts into a container.
Contingency
No.
Description
Barriers
1
Loss of Mass Control By:
Administratively controlled limits and
requirementsa
1a
Exceeding Number of Parts in
a Container
OR
1b
Exceeding Mass of Part
2
Loss of Moderator Control
Administratively controlled limits and
requirementsa (These events must occur
By:
during loading operation, or an operator
must fail to close to the container.)
2a
Failure of Sprinkler Head
OR
2b
Sprinkler Activation Because
of Fire
OR
2c
Roof Leak During Rainfall
a.
A detailed description of these administratively controlled limits and
requirements are given in Reference _.
11
|