Click here to make tpub.com your Home Page

Page Title: Requirements Documentation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-3007-93
The entire floor area underneath the Room 1021 west wall tanks and accountability tank,
and the area in front of the tray dissolver hoods has a stainless steel floor bordered with a 0.75"
high dike. This floor area is intended to contain leaks or spills and to aid in contamination
control.
Equipment
F-1202 is a standard 4" Pyrex pipe, 3'tall. F-1202 is located 2'south of tank F-1200-A.
Reference Drawings (not necessarily as-built)
J2E-XXXXX,P2E-XXXXX.
Reference Operation Procedures
OP-XXXXX.
3.0 REQUIREMENTS DOCUMENTATION
There are no unique requirements for this analysis.
4.0 METHODOLOGY
J. T. Thomas, ed., "Nuclear Safety Guide, TID-7016, Revision 2," NUREG/CR-0095
(ORNL/NUREG/CSD-6), June 1978 - Figure 2.3.
5.0 DISCUSSION OF CONTINGENCIES AND EVALUATION
Parameters
Criticality safety of the distribution trap and transfer operations depends on controlling
1-4


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business