| DOE-STD-3007-93
The entire floor area underneath the Room 1021 west wall tanks and accountability tank,
and the area in front of the tray dissolver hoods has a stainless steel floor bordered with a 0.75"
high dike. This floor area is intended to contain leaks or spills and to aid in contamination
control.
Equipment
F-1202 is a standard 4" Pyrex pipe, 3'tall. F-1202 is located 2'south of tank F-1200-A.
Reference Drawings (not necessarily as-built)
J2E-XXXXX,P2E-XXXXX.
Reference Operation Procedures
OP-XXXXX.
3.0 REQUIREMENTS DOCUMENTATION
There are no unique requirements for this analysis.
4.0 METHODOLOGY
J. T. Thomas, ed., "Nuclear Safety Guide, TID-7016, Revision 2," NUREG/CR-0095
(ORNL/NUREG/CSD-6), June 1978 - Figure 2.3.
5.0 DISCUSSION OF CONTINGENCIES AND EVALUATION
Parameters
Criticality safety of the distribution trap and transfer operations depends on controlling
1-4
|