| DOE-SPEC-3019-96
ATTENTION:
If the Owner's facility does not have the capability to provide the following services, add these items to
paragraph 1.3 and delete here.
********************
a. Installation
b. Cable interconnections between batteries and charger
c. Inter-rack/inter-[tier] [step] cables
[10] [ ] years.
The following documents form a part of this specification to the extent stated herein.
Unless otherwise indicated, use the issue in effect on the date of request for quotation.
Bring any conflicts between this specification and the referenced documents to the
attention of the Owner, in writing, for resolution before taking any related action. Where
differences exist between codes and standards, the one affording the greatest protection
shall apply.
Code of Federal Regulations (CFR)
29 CFR 1910
Occupational Safety and Health Standards (Fed/OSHA)
29 CFR 1910.7
Definitions and Requirements for a Nationally Recognized Testing
Laboratory (NRTL)
(Copies of the above government documents are available from the Superintendent of
Documents, U.S. Government Printing Office, Washington, DC 20402.)
Institute of Electrical and Electronics Engineers, Inc. (IEEE)
IEEE 100
Dictionary of Electrical and Electronics Terms
IEEE 450
Recommended Practice for Maintenance, Testing and
Replacement of Large Lead Storage Batteries for Generating
Stations and Substations
2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |