| DOE-SPEC-3021-97
SPECIFIER'S CHECKLIST
This section contains a checklist for the specifier to use in organizing technical material prior to
using the "fill-in-the-blanks" guide specification. It is recommended that the checklist be
prepared before tackling the specification, but the guide specification is fully self-contained and
may be used without the checklist if the specifier so desires.
This checklist is the list of paragraphs in the guide specification that require input from the
specifier. The list may therefore be used to ensure that all the necessary input has been
addressed and entered into the specification. The list may also be used as a study guide when
consulting supplemental references.
PARAGRAPH ACTION
Purpose. Supply the facility name and location, and the kVA rating of the
1.1
UPS system.
Definitions. Supply appropriate definitions of "Owner" and "Seller" to
1.2
avoid confusion.
Work to be Provided. Supply the specification number of the companion
1.3.f
battery specification.
System Characteristics. Supply the base characteristics of the UPS
3.1.1
system, including output characteristics, system effeciency, etc.
Design Life. Supply the expected design life of the system.
3.1.2
MTBF. Supply the expected mean time between failure (MTBF) of the
3.1.3
system.
Normal Input Sources. Supply the characteristics of the normal input
3.2.1
source.
Internal Bypass Source. Supply the characteristics of the bypass source
3.2.2
input.
UPS Module Output. Supply the characteristics of the inverter output.
3.2.3
Seismic Requirements. Supply the seismic zone coefficient value (Z).
3.2.4
Operating Environment. Supply the characteristics of the operating
3.2.5.a-f
environment.
Conformance with Existing Cables. Supply data concerning existing
3.2.6
facility cables.